Modular Masonry Retaining Wall Detail
Retaining Walls solve the need for a change in grade.
Reception Counters
If a reception counter is needed, the first decision is to determine the full role of that person.
Reception Counter Casework
A custom casework reception counter requires details to describe what is required.
Raised Counter For Seated Clerk
The ideal arrangement is clerk and patron eye-to-eye with the clerk seated and the patron standing.
Elevator Addition Details
When remodeling or expanding an existing building, adding an elevator can be a challenge.
Simple O/A Contract Templates
These templates are masters of three simple, customizable contract agreements.
Ship’s Ladder Roof Access - How To
Easy roof access is a really good idea. Here’s why. Here’s how.
4 Things To Remember When Setting Floor Heights
Add up these four things and remember masonry coursing. Rule of Thumb to help make a decision that you can run with.
Skylight Detail
Architectural liner skylight integrated into the building structure with details.
Architectural Fee As A Percent Of Construction Cost
The percentage of construction architectural fee is still a useful and powerful way to determine an appropriate fee.
Metal Stairs
Metal Stairs are used for fire exits, industrial buildings and and other "backstage” locations. Here is what the details look like.
How To Easily Start A Detail Library
A Detail Library is a good thing to have, and it is never too late to develop one. These are the four advantages.
Using UNIFORMAT II
UNIFORMAT II is an ideal organizing method for a detail library and other uses where CSI specification numbers are too restrictive.
Bridging Construction: A Project Delivery Method
An overview of the Bridging method of Project Delivery, including the steps of the process and the benefits.