Architekwiki
  • WIKI
  • Start Here
  • Resources
    • Arch Fin Model
    • MyCorbu
    • Trello-PM
    • FeeCalqs
    • OFFPLAN
    • Reading List
    • Free Resources
    • All Resources
  • Other
    • Details
    • About
    • Sign Up
    • Terms of Use
  • MyCorbu APP
  • WIKI
  • Start Here
  • Resources
    • Arch Fin Model
    • MyCorbu
    • Trello-PM
    • FeeCalqs
    • OFFPLAN
    • Reading List
    • Free Resources
    • All Resources
  • Other
    • Details
    • About
    • Sign Up
    • Terms of Use
  • MyCorbu APP

Architekwiki

A Resource For Architects
Subscribe

Design Process Checklist CD-4

11/15/2012

0 Comments

 
Picture
This is Design Process Checklist CD-4. The concept for these checklists was explained in an earlier post, Design Process Checklists. 


GENERAL - STEP IV
  * Make building permit submission (at 90+%)
  * Update budget and schedule
  * Disciplines coordination/document checking
  * Approval of CD design
  * Obtain Land Disturbance permit
  * Obtain building permit
  * Make code revisions

SITE PLANS - STEP IV
  * Planting plan

FLOOR PLANS - STEP IV
  * Material indications

ROOF PLAN - STEP IV
  * No tasks

REFLECTED CEILING PLANS - STEP IV
  * Ceiling heights indicated on plans
  * General note about dimensioning system that is being used
  * Structural bays dimensioned
  * Overall building length and width dimensioned
  * All penetrations in interior partitions that occur above the ceiling plane dimensioned
  * Metal access panels provided for access into areas above gypsum board ceilings
  * Metal access panel locations dimensioned
  * Lighting fixture locations dimensioned where necessary
  * Sprinkler head locations dimensioned where necessary
  * Air device locations dimensioned where necessary
  * Control joints in gypsum board ceilings labeled and referenced to details
  * Skylight details referenced to details
  * Soffit details referenced to details
  * Other miscellaneous details referenced to details
  * Material indications

ELEVATIONS - STEP IV
  * No tasks

BUILDING SECTIONS - STEP IV
  * Other building sections cross-referenced
  * Room names and numbers
  * Other miscellaneous details referenced to details
  * Material indications

WALL SECTIONS - STEP IV
  * Material indications

VERTICAL CIRCULATION - STEP IV
  * Plans - door types
  * Plans - room names and numbers
  * Ladder details referenced to details
  * Stairs - handrail details referenced to details
  * Stairs - guardrail details referenced to details
  * Plans - partition types indicated and referenced to details
  * Sections cross-referenced from plans
  * Structural features noted and referenced to the structural consultant as appropriate
  * Stairs/Plans - directional arrows
  * Stair details
  * Elevator details
  * Other miscellaneous details referenced to details
  * Material indications

DETAILS - STEP IV
  * Gypsum expansion joint details
  * Skylight details
  * Soffit details
  * Building section blow-ups
  * Stair, elevator, ladder details
  * Miscellaneous enlarged plan details and interior elevations
  * Door details

ENLARGED PLANS & INT ELEVATIONS - STEP IV
  * Other miscellaneous details referenced to details
  * Material indications

SCHEDULES - STEP IV
  * Door head, jamb and sill details
  * Hardware, sealant, paint, concrete finish, and miscellaneous schedules

EQUIPMENT - STEP IV
  * No Tasks

STRUCTURAL - STEP IV
  * Important details
  * Specifications

MECHANICAL SYSTEMS - STEP IV
  * Obtain plumbing permit
  * Obtain division of water permit
  * Specifications

ELECTRICAL & LIGHTING SYSTEMS - STEP IV
  * Specifications


The series of 4 Checklists are linked here:
CD CHECKLIST 1
CD CHECKLIST 2
CD CHECKLIST 3
CD CHECKLIST 4
0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    Resources

    Start Here

    Picture

    Picture

    MyCorbu

    Trello-PM

    FeeCalqs

    Picture

    Terms of Use
    Your use of Architekwiki is implicit agreement with the 
    ​
    Terms of Use.

    RSS Feed


    Categories

    All
    Business Development
    Communications
    Concepts
    Design
    Detail
    Estimating
    Finances
    Legal Issues
    Management
    Miscellaneous
    Money
    MyCorbu
    People
    Planning
    Process
    Projects
    Records
    Services
    Specifications
    Standards
    Time
    Tools


    Archives

    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    June 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012

    Resources
VISIT ARCHITEKWIKI'S RESOURCES
Picture
Architekwiki | Architect's Resource | Greater Cincinnati | (859) 444-4560
© 2012-2020   Architekwiki​