Architekwiki
  • WIKI
  • Start Here
  • Resources
    • Arch Fin Model
    • MyCorbu
    • Trello-PM
    • FeeCalqs
    • OFFPLAN
    • Reading List
    • Free Resources
    • All Resources
  • Other
    • Details
    • About
    • Sign Up
    • Terms of Use
  • MyCorbu APP
  • WIKI
  • Start Here
  • Resources
    • Arch Fin Model
    • MyCorbu
    • Trello-PM
    • FeeCalqs
    • OFFPLAN
    • Reading List
    • Free Resources
    • All Resources
  • Other
    • Details
    • About
    • Sign Up
    • Terms of Use
  • MyCorbu APP

Architekwiki

A Resource For Architects
Subscribe

Design Process Checklist CD-2

11/15/2012

0 Comments

 
Picture
This is Design Process Checklist CD-2. The concept for these checklists was explained in an earlier post, Design Process Checklists. 


GENERAL - STEP II
  * Disciplines coordination/document checking

SITE PLANS - STEP II
  * Step II
  * Parking area located dimensionally
  * Handicap parking spaces designated
  * Radius information dimensioned and noted
  * Concrete walks with expansion joints labeled and referenced to details
  * Heavy outline of building footprint with finished floor elevation
labeled
  * Building located dimensionally from property lines
  * Utility lines, powerpoles, transformers, traffic signals, manholes
  * All exterior lighting including references to details
  * Existing grades
  * Existing spot elevations
  * New grades
  * New spot elevations
  * Show encroachment permit requirements on drawings

FLOOR PLANS - STEP II
  * All changes in planes on exterior walls dimensioned
  * All penetrations in exterior walls dimensioned (i.e., windows and doors)
  * Wall sections cross-referenced
  * Building sections cross-referenced
  * Enlarged plans cross-referenced
  * Interior elevations cross-referenced
  * Building elevations cross-referenced
  * Recessed door mats dimensioned, referenced and detailed

ROOF PLAN - STEP II
  * Major features of roof dimensioned (including rooftop mechanical equipment)
  * Roof drains dimensioned and referenced to the appropriate discipline and to the details
  * Roof slope elevations labeled with spot elevations

REFLECTED CEILING PLANS - STEP II
  * Title block information (sheet title and number)
  * Drawing titles and scales
  * North arrow (incorporated into drawing title)
  * Column centerlines not drawn through entire plan
  * Column designation bubbles labeled
  * Interior partitions that do not penetrate the ceiling plane drawn as double lines with no pattern
  * Interior partitions that do penetrate the ceiling plane drawn as a double line with a dashed pattern
  * Doors into rooms drawn lightly
  * Show acoustical panel grid (tees)
  * Ceilings that are open to structure above appropriately noted

ELEVATIONS - STEP II
  * Wall sections cross-referenced
  * Building sections cross-referenced
  * Control joints labeled, referenced and detailed
  * Window types indicated

BUILDING SECTIONS - STEP II
  * No tasks

WALL SECTIONS - STEP II
  * Show components of walls
  * Show context / surrounding construction

VERTICAL CIRCULATION - STEP II
  * Title block information (sheet title and number)
  * Drawing titles and scales
  * Plans - north arrow (incorporated into drawing title)
  * Stair plans
  * Elevator plans
  * Column centerlines extending through the entire drawing
  * Column designation bubbles labeled
  * General note about dimension system that is being used
  * Interior partitions dimensioned (including partition thicknesses) by continuous strings
  * All penetrations in interior walls dimensioned (i.e., door openings)

DETAILS - STEP II
  * Site Details
  * Recessed mat details
  * Door sill details
  * Waterproofing/damp-proofing details
  * Perimeter insulation details
  * Wall control / expansion joint details

ENLARGED PLANS & INT ELEVATIONS - STEP II
  * Title block information (sheet title and number)
  * Drawing titles and scales
  * North arrow on plans (incorporated into drawing title)
  * Plans - finished floor elevations indicated with a bullet
  * Plans - column centerlines extending through the entire drawing
  * Plans - column designation bubbles labeled
  * General note about dimension system that is being used
  * Interior partitions dimensioned (including partition thicknesses) by continuous strings
  * All penetrations in interior walls dimensioned (i.e., doors)
  * Plumbing fixture locations dimensioned
  * Shafts clearly indicated and dimensioned
  * Plans - door types
  * Plans - room names and numbers
  * Structure drawn and referenced to the structural consultant

SCHEDULES - STEP II
  * Title block information (sheet title and number)
  * Drawing titles and scales
  * Finish schedule

EQUIPMENT - STEP II
  * Equipment list

STRUCTURAL - STEP II
  * Foundation plan
  * Floor framing plans
  * Roof framing plans

MECHANICAL SYSTEMS - STEP II
  * Equipment list
  * Distribution and riser diagrams

ELECTRICAL & LIGHTING SYSTEMS - STEP II
  * Lighting layouts and ceiling plans


The series of 4 Checklists are linked here:
CD CHECKLIST 1
CD CHECKLIST 2
CD CHECKLIST 3
CD CHECKLIST 4
0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    Resources

    Start Here

    Picture

    Picture

    MyCorbu

    Trello-PM

    FeeCalqs

    Picture

    Terms of Use
    Your use of Architekwiki is implicit agreement with the 
    ​
    Terms of Use.

    RSS Feed


    Categories

    All
    Business Development
    Communications
    Concepts
    Design
    Detail
    Estimating
    Finances
    Legal Issues
    Management
    Miscellaneous
    Money
    MyCorbu
    People
    Planning
    Process
    Projects
    Records
    Services
    Specifications
    Standards
    Time
    Tools


    Archives

    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    June 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012

    Resources
VISIT ARCHITEKWIKI'S RESOURCES
Picture
Architekwiki | Architect's Resource | Greater Cincinnati | (859) 444-4560
© 2012-2020   Architekwiki​