![]() This is Design Process Checklist CD-1. The concept for these checklists was explained in an earlier post, Design Process Checklists. GENERAL - STEP I * Identify CD deliverables * Disciplines coordination/document checking * Submit for zoning permit SITE PLANS - STEP I * Verify / update these items below * Property line * Street names for adjoining streets * Title block information (sheet title and number) * Drawing titles and scales * North arrow (incorporated into plan title) FLOOR PLANS - STEP I * Verify / update these items below * Title block information (sheet title and number) * Drawing titles and scales * North arrow (incorporated into drawing title) * Site features immediately adjacent to building * Finished floor elevation indicated with a bullet * Column centerlines extending through the entire plan * Column designation bubbles labeled * General note about dimension system that is being used * Structural bays dimensioned * Overall building length and width dimensioned * Directional arrows on stair plans (even if an enlarged plan is drawn) ROOF PLAN - STEP I * Verify / update these items below * Title block information (sheet title and number) * Drawing titles and scales * North arrow (incorporated into drawing title) * Column centerlines not extending through the entire plan * Column designation bubbles labeled * General note about dimensioning system that is being used * Structural bays dimensioned * Overall building length and width dimensioned REFLECTED CEILING PLANS - STEP I * No tasks ELEVATIONS - STEP I * Title block information (sheet title and number) * Drawing titles and scales * Finished floor elevations indicated with a bullet * Column centerlines not extending through the entire elevation * Column designation bubbles labeled * General note about dimension system that is being used * Finished grade at building face drawn as heavy line * Elevation of exterior features indicated with an elevation bullet BUILDING SECTIONS - STEP I * No tasks WALL SECTIONS - STEP I * Add / verify / update these items below * Title block information (sheet title and number) * Drawing titles and scales * Finished floor elevations indicated with a bullet * Column centerlines extending through the entire wall section * Column designation bubbles labeled * General note about dimension system that is being used * Roof slopes drawn correctly * Structural foundations, footings, and/or caissons drawn as broken lines if beyond VERTICAL CIRCULATION - STEP I * Input to floor plans, framing plans, sections, elevations DETAILS - STEP I * No tasks ENLARGED PLANS & INT ELEVATIONS - STEP I * No tasks SCHEDULES - STEP I * No tasks EQUIPMENT - STEP I * Input to floor plans, sections, elevations STRUCTURAL - STEP I * Basement floor plan MECHANICAL SYSTEMS - STEP I * Detailed systems selection * System drawings and key details * Input to floor plans, framing plans, sections, elevations ELECTRICAL & LIGHTING SYSTEMS - STEP I * Detailed systems selection * Input to floor plans, sections, elevations Comments are closed.
|
x
Archives
September 2023
Categories
All
|
Architekwiki | Architect's Resource | Greater Cincinnati
© 2012-2022 Architekwiki
© 2012-2022 Architekwiki