Architekwiki
  • Home
  • WIKI
  • Start Here
  • Resources
  • Other
    • Reading List
    • Ochre >
      • Ochre
      • Ochre KB
      • Ochre FAQs
      • Ochre Help
    • Details
    • The 3 Aspects
    • About
    • Subscription FAQs
    • Terms of Use
  • Subscribe
  • Home
  • WIKI
  • Start Here
  • Resources
  • Other
    • Reading List
    • Ochre >
      • Ochre
      • Ochre KB
      • Ochre FAQs
      • Ochre Help
    • Details
    • The 3 Aspects
    • About
    • Subscription FAQs
    • Terms of Use
  • Subscribe

Architekwiki

A Resource For Architects
Click here to get good stuff in your inbox

Bridging Construction: A Project Delivery Method

4/22/2019

 
Bridging
OVERVIEW OF “BRIDGING” CONSTRUCTION
A Method Of Project Delivery



CONCEPT
“Bridging” is a hybrid of Design/Build and traditional Design-Bid-Build. The selection of the Project Delivery System, i.e. how you are going to get your facility designed and built, has a great impact on the outcome of the project because it determines the environment in which issues of quality, cost and schedule will be decided.

Bridging was popularized by George Heery. Bridging saves time and money as compared to Design-Bid-Build. Bridging controls costs as compared to Design/Build by getting a defined cost for a defined scope of work, rather than a defined cost for an undefined scope of work.

The Steps of the Process are somewhat familiar and fall into the three phases listed below.


DESIGN PHASE
In all project delivery systems, a Schematic Design comes first. The Site-Related Permits should be resolved as soon as a site plan can be agreed upon. These are permits such as zoning, wetlands, storm water, highway encroachment.

Defined Scope
A key feature of Bridging is that you have a well-defined scope of the project which is represented by the Design Phase drawings and specifications which include the bidding documents. The Design Phase in Bridging normally requires more than a Schematic Design Phase but not necessarily as much as a Design Development Phase.

Schematic Design documents for a Design/Build project delivery are notoriously vague, but there is a fixed construction cost. Whenever that vagueness doesn’t produce the result that is needed, the construction cost goes up. Even a Guaranteed Maximum Price clause crumbles before these “changes in scope”.

With Design-Bid-Build, when Schematic Design documents are complete you have the architect’s estimate of costs; but it could be month’s before you have the hard numbers that bidding brings.


SELECTION PHASE
For public projects, which require open bidding, the Owner or Architect solicits bids from Design/Builders in a process similar to the normal bidding process:

• Place a legal advertisement in the newspaper and place the bidding documents on file with Dodge Reports. Specific Design/ Builders might be contacted informally to make sure they are aware of the project.
• Potential bidders obtain bidding documents which describe the project in detail and specify what will be required of them – bonds, insurance, previous experience, specific time for completion, etc.
• Sealed bids are received at a public bid opening.

Based on the submitted information and reference checks, the best bid is awarded the contract. The Contract is based on an industry standard – the American Institute of Architects Document A191, Part II, Standard Agreement Between Owner and Design/Builder.


CONSTRUCTION PHASE
The Final Design for the project is prepared by the Design/Builder or his associated design firm which provides for:
• Verification of Scope.
• Obtaining Building Permits.
• Construction Drawings.

During this phase, the Owner and their architect review and approve all documents. The Owner and their architect provide overview of the building permit process. The Owner and their architect review Submittals and Construction to verify Proper Scope and Quality.

There is also review of progress to verify that the schedule is being met and that the amounts of pay requests are legitimate. The Architect is available to assist with the management of any changes that are made or that are suggested by the Owner.

The Design/Builder who is awarded the bid is completely responsible for design and construction of the project so you have one point responsibility for any issues which arise. The Design/Builder cannot increase the cost of the project unless the Owner requests changes.

The Steps Of The Process When Bridging Construction
  1. Hire the architect.
  2. Work with the architect to develop a concept of how the spaces that are needed will be arranged.
  3. The architect refines these ideas into detailed plans for your approval.
  4. Requirements for building systems such as heating and air conditioning are determined with the architect's guidance and added to the drawings.
  5. Other requirements for finishes, fixtures and equipment are decided upon and specified in the documents the architect prepares.
  6. The architect prepares a bid package of building requirements: drawings, specifications, contractual requirements and bidding procedures.
  7. The architect or Owner places a legal ad for the project, and bidding documents are distributed to interested Design/Build firms.
  8. On the due date for receipt of bids, the Owner and the architect open the bids and evaluate the results.
  9. The Design/Build firm with the best bid, which is usually (but not always) the lowest price is awarded the work.
  10. The architect draws up a contract between the Owner and the selected Design/Build firm.
  11. The Design/Build firm begins work on the construction drawings that he requires for subcontracting the work and for building permits.
  12. Any demolition or grading work can usually begin at this point.
  13. The architect periodically reviews the Design/Build firm's final drawings as they are prepared to make sure that the agreed upon criteria are incorporated.
  14. The Design/Build firm obtains the building permits and begins work.
  15. The architect reviews submittals from the Design/Build firm and the ongoing construction to verify the specified levels of quality.
  16. Your architect reviews and approves the Design/Build firm's applications for payment.

THE BENEFITS
 You Have One-Point Responsibility For The Final Construction.

 You Have A Knowledgeable Advocate On Your Side Throughout The Project.

 You Have A Firm Price Early In The Process.

 You Save Time And Cost Over The Traditional Design-Bid-Build Process.

 You Receive Better Value Than The Design/Build Process.



More on Methods of Project Delivery.
Bridging
Picture
KH
10/6/2016 06:05:02 am

Not quite objective - it lists all the benefits, but it doesn't mention the drawbacks.

Rick Wolnitzek link
10/6/2016 10:13:07 am

KH,
The only drawbacks that I have encountered are a lack of contracts to support the concept, and the lack of familiarity by the parties involved.
Rick

Jay Adams link
4/14/2017 04:13:03 am

I want how or the method of bridging a house in building construction and a bridge per say. Moreover am a construction student and am doing this research.....

Rick Wolnitzek link
4/14/2017 05:09:40 am

Sorry, 'Jay', I don't know what you are asking.

Jamil Soucar link
1/12/2021 05:26:54 pm

Hi Rick!,
I completely agree with what you have written. I hope this post could reach more people as this was truly an interesting post.


Comments are closed.
    Resources

    Start Here

    YouTube Channel

    Join The Mailing List

    Picture

    Terms of Use
    Your use of Architekwiki is implicit agreement with the 
    ​
    Terms of Use.
    Thank You for your donation

    x
    Get Good Stuff in Your Inbox
    Picture
    Subscribe

    RSS Feed


    Archives

    January 2023
    November 2022
    October 2022
    July 2022
    June 2022
    April 2022
    October 2021
    September 2021
    August 2021
    June 2021
    May 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012

    Categories

    All
    Business Development
    Business Management
    Design
    Detail
    Miscellaneous
    Project Management
    Resources

Picture

Picture
VISIT ARCHITEKWIKI'S RESOURCES
​
START HERE
ABOUT
SIGN UP
TERMS OF USE
Architekwiki | Architect's Resource | Greater Cincinnati 
© 2012-2022   Architekwiki​