Architekwiki
  • Home
  • WIKI
  • Start Here
  • Resources
  • Other
    • Reading List
    • Ochre >
      • Ochre
      • Ochre KB
      • Ochre FAQs
      • Ochre Help
    • Details
    • The 3 Aspects
    • About
    • Subscription FAQs
    • Terms of Use
  • Subscribe
  • Home
  • WIKI
  • Start Here
  • Resources
  • Other
    • Reading List
    • Ochre >
      • Ochre
      • Ochre KB
      • Ochre FAQs
      • Ochre Help
    • Details
    • The 3 Aspects
    • About
    • Subscription FAQs
    • Terms of Use
  • Subscribe

Details

Schedules - Painting, Sealant, Accessory Schedules

11/1/2013

 
C-INTERIORS
Schedules on the drawings can have many advantages. The information is always available to the contractors. Specifications are simpler since the variable information is on the drawings. You can create a master schedule , insert it into the drawings and edit it when you are ready to make the decisions.
The Painting Schedule and the Sealant Schedule can cover the entire topic by specifying both what to use and where to use it.
The schedules below are samples of edited schedules that we have used.

Read More

Counter - Raised Counter For Seated Clerk

10/27/2013

 
C-INTERIORS
The Raised Counter Detail provides a counter integrated with a raised floor so that the clerk can be seated while the patron is standing . Without a platform, the patron looms over the clerk. Eye contact between clerk and patron is normal. An alternative solution is a tall counter at which the clerk sits on a stool. It is preferable for the patron to remain standing to keep the transaction from taking longer than needed.
See 'Comments' for ADA considerations.

Read More

Architectural Wood Panelling Details

9/19/2013

 
Picture
Elevations and Details of Architectural Wood Panelling are a good practice. In some simple projects they may not be required. However, by detailing the conditions, you create a basis for requiring the level of design that you want the project to receive. 

These details are suggested to show and specify any special configuration, construction and materials required for the conditions required at the terminations, joints and door frames that occur in the panelling.

A specification or extensive notes are required to further tie down the materials and quality required for the project. 

Read More
    donating

    Subscribe to
    Architekwiki

    Trello-PM



    MOST POPULAR ARTICLES
    (click for)


    Terms of Use

    Your use of Architekwiki is implicit agreement with the Terms of Use.

    RSS Feed


    Categories

    All
    B10 Super Struct
    B20 Ext Enclosure
    B30 Roof
    C10 Int Constr
    C20 Stairs
    C30 Int Finishes
    D10 Conveying
    E20 Eqpt+Furn
    G10 Site Prep
    G20 Site Imprvmt
    Plans
    Proj Dwgs

    Archives

    October 2018
    January 2018
    December 2017
    November 2017
    January 2016
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    January 2013

Picture

Picture
VISIT ARCHITEKWIKI'S RESOURCES
​
START HERE
ABOUT
SIGN UP
TERMS OF USE
Architekwiki | Architect's Resource | Greater Cincinnati 
© 2012-2022   Architekwiki​